Jump to content

Psyco babu signature gimmicks.


psycontr

Recommended Posts

39 minutes ago, psycontr said:

Aiethe night out cheyamanu who stopped. camping van techukoni collector office mundhu thongune dhaniki enduku ee buildup lu oka 5km doram lo unna karakatta intlo thogomanu

 

11 mohan lekka pani paatem lekunda ledduga. He has work to do, unlike some maaji cm's. incident jarigina chote administration vuntadi not some place else.

Link to comment
Share on other sites

47 minutes ago, psycontr said:

Inthaki retaining wall evaru govt lo kattincharu bro

Devudu sendranna dreams lo vachi kattinchamani cheppinadu…

one fine day, akada retaining wall ochesindi…

Hail the visionary..

  • Haha 1
Link to comment
Share on other sites

4 minutes ago, Naaperushiva said:

idhi main 2009 lo initial gaa planned if i am not wrong 2013 time lo then prp mla yalamanchili ravi started anukunta...

then gadde rammohan rao under konchem pani ayyindi tharuvaatha malli stopped malli 2020 lo ycp vallu malli started anukunta...this is the whole story 

Flood protection wall estimates finalised

The cost of building wall is Rs.104.62 crore

Published - March 04, 2013 02:32 pm IST - VIJAYAWADA:

 
PRINT

The residents of the flood-prone Ramalingeswaranagar heaved a sigh of relief with the Vijayawada Irrigation Circle finalising the estimates for the construction of a flood protection wall along the Left margin of the Krishna river.

According to the estimates finalised in February, the cost of building a wall 2.10 km long and 11.25 metres high, right up to Yenamalakuduru hill, is Rs.104.62 crore.

 

The work included in the Krishna Delta Modernisation project has been forwarded to the Finance section for approval.

The project was approved mostly due to the efforts of Vijayawada East MLA Yalamanchili Ravi. Talking to The Hindu Mr. Ravi said that the construction of the flood protection wall would benefit 5,000 to 6,000 families living in Ramalingeswaranagar, Kotinagar and Yenamalakuduru.

These areas constitute the 14 division of the Vijayawada Municipal Corporation having over 22,000 voters. It is one of the bigger civic divisions when compared to the average divisions which have only 15,000 to 18,000 votes.

Maximum discharge

The flood banks of Krishna were originally formed between 1883 and 1892 and subsequently improved from time to time. A maximum flood discharge of 11.90 lakh cusecs was recorded on October 7, 1903.

The maximum flood discharge received after construction of Prakasam Barrage was 11.10 lakh cusecs.

The right bank of Bandar Canal was originally considered the flood bank for Krishna up to Yenamalakuduru Hill where the left bank of the river actually starts.

The common bank was subsequently converted as the National Highway until the point it crosses the Bandar Canal (Skew Bridge).

The part of the flood bank that currently protects Krishnalanka area was formed in 1967-68.

The 3.38 km flood bank was formed to protect Krishnalanka, Bramarambhapuram, Dwarakanagar, Ranigarithota and Balajinagar.

More colonies developed along the margin of the river in Ramalingeswaranagar, right up to Yenamalakuduru, over four decades.

The Municipal Corporation has built a retaining wall 600 metres long to protect a drain collection sump, a 10 MGD water treatment plant and a sewage treatment plant. The retaining wall has been designed with no earth filling on the outside, according to the report.

The new wall does not overlap with this wall.

Link to comment
Share on other sites

10 minutes ago, Android_Halwa said:

Devudu sendranna dreams lo vachi kattinchamani cheppinadu…

one fine day, akada retaining wall ochesindi…

Hail the visionary..

No, its all 11 reddy. Hail the 11 father, hail the 11.

  • Haha 1
Link to comment
Share on other sites

1 hour ago, akkum_bakkum said:

11 mohan teddy aithe helicopter eskoni vellevademo kada....chuss!

You forgot the shikkati shirunavvu on his face looking at all the flood affected areas

Link to comment
Share on other sites

10 hours ago, Naaperushiva said:

lol

 

 

 

Vijayawada: YS Jagan lays foundation stone for construction of retaining wall in Krishna Lanka Pavan Kumar Bandari Hans News Service | 31 Mar 2021 1:01 PM IST x Andhra Pradesh Chief Minister YS Jagan Mohan Reddy HIGHLIGHTS The long dream of the people of Vijayawada East constituency is about to come true as Andhra Pradesh Chief Minister YS Jagan Mohan Reddy on Wednesday The long dream of the people of Vijayawada East constituency is about to come true as Andhra Pradesh Chief Minister YS Jagan Mohan Reddy on Wednesday laid the foundation stone for the construction of the retaining wall in Krishna Lanka. This will provide a permanent solution to the people of Krishna Lanka who are suffering due to the floods of the Krishna River. The retaining wall will be constructed at a cost of Rs 125 crore. Also Read - Mopidevi Venkata Ramana and Beda Mastan Rao submits resignation to Rajya Sabha Chairman ADVERTISEMENT Ministers Vellampalli Srinivasa Rao, Kodali Sri Venkateswara Rao, Perni Venkatramaiah, Anil Kumar Yadav, Botsa Satyanarayana, Government Whip Samineni Udaya Bhanu, Chief Secretary Srilakshmi, Jay Shyamala Rao, Collector MD Imtiaz, Brahmin Corporation Chairman Malladi Vishnu, MLC Karimunnisa and MLAs Kyle Kumar and other YSRCP leaders and officials were present on the occasion. Also Read - Former Minister Botsa Satyanarayana to Contest as MLC Candidate for Visakha Local Bodies ADVERTISEMENT Flood protection retaining wall will be constructed along the 1.5 km stretch from Vijayawada Kanaka Durga Bridge to Kotinagar. About 12 lakh cusecs of water is flowing into the river when there is heavy flooding. The retaining wall is designed to withstand the flood currents. As part of this, a 1.5 km long concrete wall with a height of 8.9 m is being constructed on pile and raft foundations 18 m deep with a diameter of three feet. Also Read - Power-obsessed YSRCP chief lacking sense of responsibility ADVERTISEMENT However, when the Krishna River flooded in 2009, the then Chief Minister Dr. YS Rajasekhara Reddy came to Vijayawada and sanctioned the flood retaining wall. This wall was built at that time from Yanamalakuduru to Kotinagar. As a continuation of this, a flood retaining wall is currently being constructed from Karakatta (bridge) to Kotinagar.

https://www.thehansindia.com/andhra-pradesh/mopidevi-venkata-ramana-and-beda-mastan-rao-submits-resignation-to-rajya-sabha-chairman-903136?infinitescroll=1

 

 

 

Andhra Pradesh
 

Funds for retaining wall in Vijayawada finally sanctioned months after Krishna floods

The wall was proposed in 2009 but has been delayed due to administrative hurdles and lack of funds.
Funds for retaining wall in Vijayawada finally sanctioned months after Krishna floods
 
Funds for retaining wall in Vijayawada finally sanctioned months after Krishna floods
Written by:
 
Published on: 
03 Feb 2020, 4:28 am
  •  
  •  
  •  
  •  
  •  
  •  
 

The Andhra government on Monday sanctioned Rs 125 crore for the completion of the retaining wall along the Krishna river bund in Vijayawada. The long-awaited wall is intended to prevent flooding in the low-lying areas in the city situated along the Krishna river. 

Repeated floods in the Krishna river last year affected low-lying areas in and around the Krishnalanka area in Vijayawada, including Rani Gari Thota, Tarakarama Nagar, and Ramalingeswara Nagar. Many families suffered due to loss or damage to their belongings and repeated evacuations, with some of them even losing their thatched roof homes and being displaced. 

The retaining wall, which could shield the residents from flood waters, is said to have been proposed in 2009, which was the last time that the city was flooded so severely. In spite of longstanding demands, the wall has only been partially completed so far. A long stretch from Ramalingeswaranagar continuing up to Rani Gari Thota and beyond is yet to be completed. Due to breaches in the structure of the wall, even the areas where the wall has been built were submerged. The long-delayed construction work was started by the previous TDP government but was left midway due to shortage of funds. 

Minister for Municipal Administration and Urban Development Botsa Satyanarayana said that Chief Minister Jagan Mohan Reddy had instructed officials to complete the work on the retaining wall, in order to safeguard Krishnalanka and other wards in the region from submersion during floods. 

Announcing the sanction of Rs 125 crore for completing the wall, Panchayat Raj Minister Peddireddy Ramachandra Reddy said, “If needed, the government is ready to allocate even more,” adding that the CM is keen on developing Vijayawada city

The Krishna River -- which originates in Maharashtra and traverses through Karnataka and Andhra before draining into the Bay of Bengal -- saw heavy floods in 2019, starting in August and recurring a few times after that. Heavy rainfalls in Maharashtra and Karnataka forced dam authorities to open the gates, resulting in flooding downstream of the river. 

 

https://www.deccanchronicle.com/nation/in-other-news/240916/vijayawada-krishna-river-retaining-wall-remains-a-mirage.html

 

 

 

 

 

 

Link to comment
Share on other sites

10 hours ago, Android_Halwa said:

Devudu sendranna dreams lo vachi kattinchamani cheppinadu…

one fine day, akada retaining wall ochesindi…

Hail the visionary..

Ledu uncle, poina ysr pavuram thi pampadu … mi anna midnight 2 ki matladuthadu kada, morning kalla pavuram techi pettesindhi… oh my piece piece reddy

Link to comment
Share on other sites

36 minutes ago, 11_MohanReddy said:

 

 

Jaffas grudh@, noru close chesava anna okka video proof tho, sakshit article eskoni vastharu wait chey

Link to comment
Share on other sites

12 hours ago, psycontr said:

BZA collector office to Secretariat distance 16km

BZA collector office to CM camp office: 7km

Dhaniki oka camping van, temporary CM office antu buildup lu

 

aa matram undali dorling lekapothey manavallu pani tevlacharu.....

Link to comment
Share on other sites

5 minutes ago, Thokkalee said:

Em lolli vaa idi… no news about the peoples problems.. sakshi should highlight the people’s problems and not focus on cbn.. 

At this point they are obsessed with babu....on medical levels

Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

×
×
  • Create New...