17 minutes ago, TampaChinnodu said:

ok man. Elon musk tho cheppi hyper loop kooda kattinchukondi. future singapore antey aa matram vundali kada.

sare maadi mem kadukuntamlegani..pakkanodidi arindho ledo chudakunda meedi meeru kadukkondi... 4alrni7.gif

Link to comment
Share on other sites

  • Replies 90
  • Created
  • Last Reply

Top Posters In This Topic

  • Kontekurradu

    19

  • micxas

    11

  • idibezwada

    11

  • TampaChinnodu

    11

Top Posters In This Topic

VIJAYAWADA:ll the proposed metro rail in Vijayawada serve the purpose of better transport connectivity in the city? People in the city seem to have reservations over it.  “Where is the need for metro rail in the city which has hardly 10 lakh population and a radius of less than 10 km? Further, the plans that have been drawn today, as being reported, do not connect the places where it is needed,” V Raghavendra, a 40-year-old resident of Autonagar, points out.

He has a point as the proposed metro rail in the city will be having two corridors, one stretching along Bandar Road from Pandit Nehru Bus Station (PNBS) to Penamaluru and the other stretching along Eluru Road from PNBS to Nidamanuru, covering a total distance of 26.03 km. With proposals to extend it to Amaravati, the state capital in a subsequent phase.

But what about One Town, the densely populated area in the city, where commercial locations like KR Market and  Vastralatha are present? Most importantly, the area has the temple of Goddess Kanaka Durga, the foremost landmark of Vijayawada.

“People who generally use public transport live in areas like Ajit Singh Nagar, Rajiv Kandrika, Auto Nagar and such areas which do not feature in the Metro Rail Project plans. The routes on which the metro rail corridors have been proposed have road connectivity and those using own vehicles would continue to use them, regardless of whatever public transport system is introduced,” pointed out MV Anjaneyulu, general secretary of taxpayers association.

He says one cannot expect a person working in Kandrika and Ajit Singh Nagar to come all the way to PNBS to catch metro to Auto Nagar. “What is being now proposed looks aimed at easing traffic problems; if it be the case, flyovers at Benz Circle and Indrakeeladri Hill along with Inner and Outer Ring Road will do,” he says.

A senior doctor practising in Bodemma Hotel Centre area of One Town in the city, not wishing to be named, suggests that the policy makers go for projects, which are viable and productive for the immediate requirements rather than going for grandiose plans in a bid to outdo other cities.

The project is estimated to cost `6,823 crore and the figure might go up several times, if the plans for metro connecting the capital city are taken into consideration. Even the DMRC (Delhi Metro Rail Corporation) people who gave DPR for Vijayawada metro have their reservations over its expansion to the capital region and instead suggest Rapid Rail Transport System or Multi Modal Transport system.

According to C Swamy Charan, former divisional secretary of SCR Vijayawada Division Railway Mazdoor Union, the existing railway network can be used to address the transport needs of Vijayawada as well as connecting it to the new capital. “There is a pending proposal for circular train connecting Vijayawada-Mangalagiri-Guntur-Tenali-Mangalagiri. If the existing track is doubled, more trips of circular train can be used,” he said.

According to him, similar circular route can be developed in Vijayawada, if the government takes the initiative to connect the Vijayawada railway station to the existing Vijayawada-Gudur-Machilipatnam line covering Yanamalakuduru and  Auto Nagar areas.

Since the government is already planning for having a flood bank at Ramalingeswara Nagar, the same can be incorporated for railway track saving the land acquisition problem.

“Operation of  small trains between Vijayawada and Guntur as well as  Vijayawada and Rajahmundry can be very useful,” he opined.

Link to comment
Share on other sites

1 minute ago, TampaChinnodu said:

VIJAYAWADA:ll the proposed metro rail in Vijayawada serve the purpose of better transport connectivity in the city? People in the city seem to have reservations over it.  “Where is the need for metro rail in the city which has hardly 10 lakh population and a radius of less than 10 km? Further, the plans that have been drawn today, as being reported, do not connect the places where it is needed,” V Raghavendra, a 40-year-old resident of Autonagar, points out.

He has a point as the proposed metro rail in the city will be having two corridors, one stretching along Bandar Road from Pandit Nehru Bus Station (PNBS) to Penamaluru and the other stretching along Eluru Road from PNBS to Nidamanuru, covering a total distance of 26.03 km. With proposals to extend it to Amaravati, the state capital in a subsequent phase.

But what about One Town, the densely populated area in the city, where commercial locations like KR Market and  Vastralatha are present? Most importantly, the area has the temple of Goddess Kanaka Durga, the foremost landmark of Vijayawada.

“People who generally use public transport live in areas like Ajit Singh Nagar, Rajiv Kandrika, Auto Nagar and such areas which do not feature in the Metro Rail Project plans. The routes on which the metro rail corridors have been proposed have road connectivity and those using own vehicles would continue to use them, regardless of whatever public transport system is introduced,” pointed out MV Anjaneyulu, general secretary of taxpayers association.

He says one cannot expect a person working in Kandrika and Ajit Singh Nagar to come all the way to PNBS to catch metro to Auto Nagar. “What is being now proposed looks aimed at easing traffic problems; if it be the case, flyovers at Benz Circle and Indrakeeladri Hill along with Inner and Outer Ring Road will do,” he says.

A senior doctor practising in Bodemma Hotel Centre area of One Town in the city, not wishing to be named, suggests that the policy makers go for projects, which are viable and productive for the immediate requirements rather than going for grandiose plans in a bid to outdo other cities.

The project is estimated to cost `6,823 crore and the figure might go up several times, if the plans for metro connecting the capital city are taken into consideration. Even the DMRC (Delhi Metro Rail Corporation) people who gave DPR for Vijayawada metro have their reservations over its expansion to the capital region and instead suggest Rapid Rail Transport System or Multi Modal Transport system.

According to C Swamy Charan, former divisional secretary of SCR Vijayawada Division Railway Mazdoor Union, the existing railway network can be used to address the transport needs of Vijayawada as well as connecting it to the new capital. “There is a pending proposal for circular train connecting Vijayawada-Mangalagiri-Guntur-Tenali-Mangalagiri. If the existing track is doubled, more trips of circular train can be used,” he said.

According to him, similar circular route can be developed in Vijayawada, if the government takes the initiative to connect the Vijayawada railway station to the existing Vijayawada-Gudur-Machilipatnam line covering Yanamalakuduru and  Auto Nagar areas.

Since the government is already planning for having a flood bank at Ramalingeswara Nagar, the same can be incorporated for railway track saving the land acquisition problem.

“Operation of  small trains between Vijayawada and Guntur as well as  Vijayawada and Rajahmundry can be very useful,” he opined.

This old news. Does the questions raised in this article still apply ?

Link to comment
Share on other sites

4 hours ago, barney said:

hopefully they complete it before next elections, we never know 

Eppudu 2019 ki munda?? Kalla ayye pani kaadu....

Now bidding will start once given they will plan the project and then start construction, daaniki enta ledanna 2 years , rolling stock ravali & then testing avutadi...

Asalu Cinema CRS department chetilo untadi, vaallu safety check and other procedures chestaru so enta ledanna it will take atleast 4 yrs from now...

 

Link to comment
Share on other sites

8 minutes ago, Kool_SRG said:

Eppudu 2019 ki munda?? Kalla ayye pani kaadu....

Now bidding will start once given they will plan the project and then start construction, daaniki enta ledanna 2 years , rolling stock ravali & then testing avutadi...

Asalu Cinema CRS department chetilo untadi, vaallu safety check and other procedures chestaru so enta ledanna it will take atleast 4 yrs from now...

 

4 years ki same GOVT vunte ayye chances vuunayi but takes more than 4 years , GOVT change ayihte, 10 years pattina patochu 

Link to comment
Share on other sites

2 hours ago, Kool_SRG said:

Eppudu 2019 ki munda?? Kalla ayye pani kaadu....

Now bidding will start once given they will plan the project and then start construction, daaniki enta ledanna 2 years , rolling stock ravali & then testing avutadi...

Asalu Cinema CRS department chetilo untadi, vaallu safety check and other procedures chestaru so enta ledanna it will take atleast 4 yrs from now...

 

Youtube lo land aquisition ki public entha godava sesthunnaro videos vunnayee . soodu. 

Link to comment
Share on other sites

4 minutes ago, fake_Bezawada said:

don't worry contracts and sub contracts maa patcha thammulu anna gari kula sabyulaku velthay baaga tintaru

yes nect 2019 lo mana daivam PK Cm avuthadu , appudu contracts anni, mana Onion brothers ke vastayile 
wait and watch, debba padithe Pacha thamullaki dimma tiragali 

Link to comment
Share on other sites

2 minutes ago, Kontekurradu said:

yes nect 2019 lo mana daivam PK Cm avuthadu , appudu contracts anni, mana Onion brothers ke vastayile 
wait and watch, debba padithe Pacha thamullaki dimma tiragali 

@3$% PK antha kula gajji gadu kademo

but nuvvu chepindhi jaragaka povachu emo 

mana patcha party ki aythe kamma sodarlu overall world nunchi funds istaru pyga media hand lo vundhi adokati chalu evadini ayna degrade cheseyataniki 

baaga nelaki tokkestaru 

Link to comment
Share on other sites

2 minutes ago, fake_Bezawada said:

@3$% PK antha kula gajji gadu kademo

but nuvvu chepindhi jaragaka povachu emo 

mana patcha party ki aythe kamma sodarlu overall world nunchi funds istaru pyga media hand lo vundhi adokati chalu evadini ayna degrade cheseyataniki 

baaga nelaki tokkestaru 

Mana ki, Mudragada vuunaudu, Anayya + Dasari + Vzg nunid G V naidu (Lawyer) 

and 31% vote bank vundi, idi chalu CM avvataniki 


giphy.gif

Link to comment
Share on other sites

6 minutes ago, Kontekurradu said:

Mana ki, Mudragada vuunaudu, Anayya + Dasari + Vzg nunid G V naidu (Lawyer) 

and 31% vote bank vundi, idi chalu CM avvataniki 


 

veelevaru peekaleru le vala kada mana kamma nayakula daggara vunantha paisal vundav 

Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

×
×
  • Create New...