Jump to content

TDP MAGIC SHOW - TEMP MONSOON DAM = POLAVARAM


ARYA

Recommended Posts

WOWW....WHAT A MAGIC SHOWWWW...APPATLO DEVUDU LANTI PEDDAYANNI VENNUPOTU...IPPUDU 2018 LO POLAVARAM ANI CHEPPI TEMP DAM PERU THO AP PRAJALAKI VENNUPOTU 

Image result for kattappa gifs

 

 

Link to comment
Share on other sites

4 minutes ago, kamarao said:

Scam latho munigina govt tdp di 

 

5 minutes ago, ARYA said:

WOWW....WHAT A MAGIC SHOWWWW...APPATLO DEVUDU LANTI PEDDAYANNI VENNUPOTU...IPPUDU 2018 LO POLAVARAM ANI CHEPPI TEMP DAM PERU THO AP PRAJALAKI VENNUPOTU 

you want pk's administration or jagga's?

Link to comment
Share on other sites

Just now, BossIzzWell said:

 

you want pk's administration or jagga's?

KATTAPPA inko new ID ok BLOCKINNNGGGG ...siggu seram maanam abhimaanam anni Kulanikee ankitham Image result for kattappa gifs

Link to comment
Share on other sites

6 minutes ago, ARYA said:

KATTAPPA inko new ID ok BLOCKINNNGGGG ...siggu seram maanam abhimaanam anni Kulanikee ankitham 

g*d** gusanam anni na matta loki ankitam emi kadu? kulam endira kulam? enni generations poyina ade edupa? thu nee batuku

kulagajji nunchi bayatakochi saavandra

Link to comment
Share on other sites

7 hours ago, perugu_vada said:

Temp aina it is still useful annaru ga ? Ofcourse scams/wastage ekuve, still it helps quite a few thousands of acres of lands annaru ;) calling @tom bhayya

Maa rajanna 6 yrs lo vesina foundation stone ey manchidhi ilaanti temp projects kanna ani @ARYA uncle antharangam 

Link to comment
Share on other sites

3 minutes ago, tom bhayya said:

Maa rajanna 6 yrs lo vesina foundation stone ey manchidhi ilaanti temp projects kanna ani @ARYA uncle antharangam 

musugu kattappa spotted @3$% tom bhayya

Link to comment
Share on other sites

39 minutes ago, ARYA said:

musugu kattappa spotted @3$% tom bhayya

Manchi evaru chesina mechukovaali, just because we don't like vaadu em chesina thappu antey slaves ki msnaki theda undadhu

Link to comment
Share on other sites

1x1_spacer.gif09VJPG5-POLAVARAM

Prestigious project: Chief Minister N. Chandrababu Naidu inspecting the Polavaram works on Thursday.   | Photo Credit: PTI

MORE-IN

It can substitute for the ECRF dam till its completion in 2019

The 2.3-km structure will have a core of clay and a shell of rock and its purpose is to facilitate the construction of an earth-cum-rock-filled (ECRF) dam across the mighty Godavari at Polavaram. The cofferdam is so mighty that it can substitute for the ECRF dam until its scheduled completion in 2019.

The efforts being made by Chief Minister N. Chandrababu Naidu to ensure that the project is completed as per schedule — flowing of water by gravity into its canals by mid 2018 and completion of the project by mid 2019 — are formidable.

Mr. Naidu laid the foundation stone for the unique cofferdam on Thursday.

The actual work of construction on the cofferdam will begin after the rainy season. This is because the rains usually result in a massive flood in the river, on an average discharges are around 3,000 tmcft into the Bay of Bengal each year. Construction will begin in November and will be completed by July, said water resources Engineering-in-Chief M. Venkateswara Rao.

Though it is temporary, it will have the capacity to stand up to a flood of 28.6 lakh cusecs.

There will be two cofferdams — one upstream the ECRF Dam that is 2.3 km long — and the other downstream which is 1.4 km.

The upstream cofferdam will be 27 metres above the river bed and the other one will be about 20 metres from the river bed, Mr. Venkateswara Rao said. The upstream cofferdam has the capacity to hold 120 tmcft while the project will have the capacity to hold 194 tmcft. The project on completion will have a “live” capacity of 75 tmcft, but water could be sent into the Left and Right Polavaram main canals by holding just 30 to 40 tmcft, he said.

Two types

There were two types of cofferdams, those that protect the dam work in “non-monsoon season” and those that protect the work in progress during the monsoon season. It was decided that a cofferdam with the capacity to protect work during the monsoon would be taken up at Polavaram for the quick completion of the project and restriction of cost escalation, he said. But tremendous coordination is needed for completion of work for sending water by gravity to the canals. The simultaneous construction of the spillway which includes fabrication and erection of the spillway gates is essential for impounding water and sending it into the canals.

http://www.thehindu.com/news/national/andhra-pradesh/polavaram-the-cofferdam-which-will-act-as-a-dam/article18869578.ece

Link to comment
Share on other sites

14 minutes ago, tom bhayya said:

Manchi evaru chesina mechukovaali, just because we don't like vaadu em chesina thappu antey slaves ki msnaki theda undadhu

so undavalli thata thappu cheppadaa sandral saar correct sesadaa intaki evarini mecchukuntunnav enti manchi 

Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

×
×
  • Create New...