Jump to content

అమరావతిని నిర్మించినంత వేగంగా ప్రపంచంలో ఏ నగర నిర్మాణమూ సాగలేదు


TampaChinnodu

Recommended Posts

Iconic Bridge to take more time to start
Iconic Bridge to take more time to start
 
 

Amaravati: With the decision of Amaravati Development Corporation (ADC) to invite fresh tenders for Iconic Bridge on River Krishna, the works of much-awaited bridge which was proposed to connect Bridge between Pavitra Sangamam and Amaravati Administration Area, may take more time to begin.

 

As the tenders submitted by three bidders last year were cancelled, the ADC invited tenders again a few days ago reducing the budget estimation by Rs 86 crore. According to chief engineer of ADC Moses Kumar, the estimation of bridge has been reduced to Rs 1,349 crore from the initial estimation of Rs 1,43.26 crore. 

 
 
 
 
 
 
 
 
 
 

He refused to explain the reasons, saying that the decision was taken on administrative grounds. The ADC invited the fresh tenders on Engineering, Procurement and Construction (EPC) basis to design and construct Iconic Bridge across River Krishna.

 
 
 

The 3.2 km long, six-lane iconic bridge is designed connecting National Highway 65 at Pavitra Sangamam near Ibrahimpatnam in Krishna district to No 10 road in capital city, Amaravati. From Ferry at Ibrahimpatnam to Nandigama, the Krishna river divides Krishna and Guntur districts. Once the Iconic Bridge is completed, vehicles coming from Hyderabad can go to Amaravati directly and it will connect the two districts.

 

L&T Constructions, SP Singla Constructions and Sibmost Company as well as some architecture students have presented concept designs to the  ADC. Infrastructure major L&T submitted six designs to Chief Minister N Chandrababu Naidu in March, 2017. 

 

The Chief Minister wants the bridges to be iconic and inspirational one that truly reflects the culture of Andhra Pradesh. The ADC officials said that they had invited fresh tenders as the technical evaluation was not done properly when tenders were first invited in 2017. In fresh tenders, operation and maintenance (O&M) was included for five years only as against 10 years in early tenders. 

 

“Reducing O&M period to five years is one of the reasons for decrease in bridge estimation,” an official told The Hans India. Sources said that the Chief Minister had suggested that ADC expedite the tender process and complete the bridge as early as possible as it is vital in connecting National Highway 65 to the capital city.

Link to comment
Share on other sites

Quote

As the tenders submitted by three bidders last year were cancelled, the ADC invited tenders again a few days ago reducing the budget estimation by Rs 86 crore. According to chief engineer of ADC Moses Kumar, the estimation of bridge has been reduced to Rs 1,349 crore from the initial estimation of Rs 1,43.26 crore. 

kaavali selli pelli malli malli.  

sendral sir matram tenders malli malli pilisi years years time pass seyyochu. But center matram lands ichina 3 months lo katteyyali @3$%

Hoping modi inka 10gaali ilage ani. 

Link to comment
Share on other sites

2 hours ago, TampaChinnodu said:

kaavali selli pelli malli malli.  

sendral sir matram tenders malli malli pilisi years years time pass seyyochu. But center matram lands ichina 3 months lo katteyyali @3$%

Hoping modi inka 10gaali ilage ani. 

Nee TDP hatred pulka post ardham ayyindhi - Mari AP ki 2019 lo... yevaru CM aithee best ???

Link to comment
Share on other sites

46 minutes ago, jathin said:

Nee TDP hatred pulka post ardham ayyindhi - Mari AP ki 2019 lo... yevaru CM aithee best ???

2014-2019 varaku chandraal saar emi chesi elagapetindo, adi chusi decide chesukovali vaya...evaraithe best, evadu worst ani inkodu chepithe vinudu kaadu

Link to comment
Share on other sites

51 minutes ago, jathin said:

Nee TDP hatred pulka post ardham ayyindhi - Mari AP ki 2019 lo... yevaru CM aithee best ???

It is up to you guys man , if you are from AP. I am not from AP. 

On this particular point I did not find any fault of center when considering CBN himself didn't build anything for 4 years, But he is expecting center to start construction within 3 months. And he is charging more money for lands from center than compared to foreign companies. 

vallu matram designs ani years years time pass seyyochu. But center matram 3 months lo katteyyala ? Center kattesthe adi kooda valla credit loki vesukovali ani yellow batch master plan. nene katta , nene thecha , antha nene ani. 

Link to comment
Share on other sites

19 minutes ago, Android_Halwa said:

2014-2019 varaku chandraal saar emi chesi elagapetindo, adi chusi decide chesukovali vaya...evaraithe best, evadu worst ani inkodu chepithe vinudu kaadu

We have only one option bro.. I.e CBN

center level playing field oche varaki help chesthe rough adinchadame all top states ni 

Link to comment
Share on other sites

2 hours ago, TOM_BHAYYA said:

We have only one option bro.. I.e CBN

center level playing field oche varaki help chesthe rough adinchadame all top states ni 

OybV9Pj.jpg

Link to comment
Share on other sites

2 hours ago, TOM_BHAYYA said:

We have only one option bro.. I.e CBN

center level playing field oche varaki help chesthe rough adinchadame all top states ni 

brahmiwhistling.gif

Perfect bhayya 

Only cm to use tech for social welfare than any one

River interlink chesina leader 

Bodi ni edurkuney dammuna leader

Cbn rocks

 

Link to comment
Share on other sites

19 minutes ago, futureofandhra said:

brahmiwhistling.gif

Perfect bhayya 

Only cm to use tech for social welfare than any one

River interlink chesina leader 

Bodi ni edurkuney dammuna leader

Cbn rocks

 

 

Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

×
×
  • Create New...