4 minutes ago, snoww said:

Nope. Started in YSR time

VIJAYAWADA: Polavaram multi-purpose project on Godavari river, considered the lifeline of the State, was first proposed in 1941 and preliminary investigations were carried out between 1942 and 44. Diwan Bahadur Venkata Krishna Iyer, the chief engineer of the Irrigation Department in Madras Presidency conduct the first survey and proposed the project to irrigate 1.4 lakh hectares and generate 40 MW of hydroelectric power. The estimated cost of the project at the time was `65 million. 

The old designs were for a full reservoir level of 208 ft MLS with 836 TMCFT and the name proposed was Ramapada Sagar project. However, due to technical and economic reasons, the project did not take off. With the demand for the project increasing, the Congress government in the late 70s decided to take up the project. In 1980, then Chief Minister T Anjaiah laid the foundation stone for the project. However, for the some reasons, it was not taken up earlier and the project was put on a back burner for the next two decades. 

Link to comment
Share on other sites

14 minutes ago, tom bhayya said:

VIJAYAWADA: Polavaram multi-purpose project on Godavari river, considered the lifeline of the State, was first proposed in 1941 and preliminary investigations were carried out between 1942 and 44. Diwan Bahadur Venkata Krishna Iyer, the chief engineer of the Irrigation Department in Madras Presidency conduct the first survey and proposed the project to irrigate 1.4 lakh hectares and generate 40 MW of hydroelectric power. The estimated cost of the project at the time was `65 million. 

The old designs were for a full reservoir level of 208 ft MLS with 836 TMCFT and the name proposed was Ramapada Sagar project. However, due to technical and economic reasons, the project did not take off. With the demand for the project increasing, the Congress government in the late 70s decided to take up the project. In 1980, then Chief Minister T Anjaiah laid the foundation stone for the project. However, for the some reasons, it was not taken up earlier and the project was put on a back burner for the next two decades. 

Director krish laa neeku kaavalsina history ne post chesthe ela bro. post all the history. 

shankushapana ayyi chaala decades ayyindi. but major permissions for the project only started in YSR term and some canals work. But major construction of the Dam is happening now.

Quote

 

In 1980, then Chief Minister of Andhra Pradesh T. Anjaiah laid the foundation stone for the project to fulfill the stipulations of Godavari Water Disputes Tribunal agreement.[29] The project is stalled till YSR Reddy in 2004 the then chief minister of AP took the project to work. YSR got the required permissions for the projects before he died.[30] for polavaram project, Site clearance was obtained from the Centre on 19 September 2005, environmental clearance on 25 October 2005, R & R clearance on 17 April 2007, wildlife sanctuary clearance on 19 Sept 2008, forest clearance on 26 Dec, 2008 and technical advisory committee clearance on 20 January 2009. Progress of polavaram hit road block post YSR death.[31] later, Polavaram project is declared as national project through AP special re-org act in 2014.[32] It was made a “national project” by AP reorganisation act 2014.

Naidu has pushed the project to its last leg — concrete work of the dam, the main component of the project, is under way.[33] After 14 years of initiating the project works, the first major mile stone of completing the 1400 meters long diaphragm wall was achieved in June, 2018 which will lead to the project usage for water supply in incremental stages with the further progress of other works.[34] The project senior officials are confirming that they are confident of supplying water by gravity to the canals from the onset of 2019 monsoon.

 

 

Link to comment
Share on other sites

YSR did a lot of work during initial days of his first tenure (2004-2006 or so)  and acquired a lot/most of the land for the canals. Many thought this will complete very quickly. 

 

Not sure about the reasons, but works came to a standstill from 2007 or so until 2014 (AP Reorg). Its now going in full speed probably due to funds coming from the centre 

Link to comment
Share on other sites

Polavaram daggara 365 days water vuntundi 

ysr get permissions 

kiran time lo canals begin ayyayi 2016 ki ayyayi 

dam works begin 2017 lo begin ayyayi 

2020 ki ayithe great 

power project 2025 ki complete ayyiddi 

major land acquisition 2020 lo begin ayyiddi as per plan 

Link to comment
Share on other sites

1 hour ago, AndhraneedSCS said:

YSR did a lot of work during initial days of his first tenure (2004-2006 or so)  and acquired a lot/most of the land for the canals. Many thought this will complete very quickly. 

 

Not sure about the reasons, but works came to a standstill from 2007 or so until 2014 (AP Reorg). Its now going in full speed probably due to funds coming from the centre 

R & R clearance on 17 April 2007, wildlife sanctuary clearance on 19 Sept 2008, forest clearance on 26 Dec, 2008 and technical advisory committee clearance on 20 January 2009. 

Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

×
×
  • Create New...