Jump to content

Construction cost


AleAle

Recommended Posts

Just now, chaikumar said:

Apudu adhi G+3 avutundi. G ki cost + 3 floors ki cost. Lift lekapothe 3rd floor vaallaki ibbandi.

Lift kooda petteddam ... Aathcare paisal.ante manaki ..2nd mogud alimony kooda vastadi ..kavalante esclator kooda pettiddam...nuv pricing cheppavoy

Link to comment
Share on other sites

Just now, chaikumar said:

Apudu adhi G+3 avutundi. G ki cost + 3 floors ki cost. Lift lekapothe 3rd floor vaallaki ibbandi.

Hey em matladtunav

lift enduku undadu its first thing 

3 flats unna place lo lavishga 

Link to comment
Share on other sites

1 minute ago, Love_Guru said:

Lift kooda petteddam ... Aathcare paisal.ante manaki ..2nd mogud alimony kooda vastadi ..kavalante esclator kooda pettiddam...nuv pricing cheppavoy

Lol 

Link to comment
Share on other sites

4 minutes ago, chaikumar said:

Apudu adhi G+3 avutundi. G ki cost + 3 floors ki cost. Lift lekapothe 3rd floor vaallaki ibbandi.

So enta avtundi budget is 1.2 cr for construction 

plot is expensive sell cheyadalchukoledu, malli dorkadu land akda 

Link to comment
Share on other sites

Just now, AleAle said:

Hey em matladtunav

lift enduku undadu its first thing 

3 flats unna place lo lavishga 

first thing first page lo cheppali. ee db lo antha lavish people leru to assume lavish requirements.

Link to comment
Share on other sites

220 sq yards = 1980 sqft.
oka 20% land common area, compound wall, lift, gaps etc ki pothe, you will have 1600 sqft per floor.

if (cost per sqft == 2500)
   3 floors cost = 3 * 1600 * 2500 = 1.2C
   lift cost = guessing 10L
   ground floor cost = 5-10L
   current, water, drainage connections etc = 5L?

Real estate projects epudu anukunna budget lo anukunna time ki avvavu. Add 20% buffer.

Rough ga 1.5c to 1.8c avvochu.

Link to comment
Share on other sites

6 minutes ago, chaikumar said:

220 sq yards = 1980 sqft.
oka 20% land common area, compound wall, lift, gaps etc ki pothe, you will have 1600 sqft per floor.

if (cost per sqft == 2500)
   3 floors cost = 3 * 1600 * 2500 = 1.2C
   lift cost = guessing 10L
   ground floor cost = 5-10L
   current, water, drainage connections etc = 5L?

Real estate projects epudu anukunna budget lo anukunna time ki avvavu. Add 20% buffer.

Rough ga 1.5c to 1.8c avvochu.

max 1.5 C anthe , it should be fine 

Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

×
×
  • Create New...