Jump to content

Kaleshwaram: NTPC agrees to offer power at cheaper rates


hyperbole

Recommended Posts

Kaleshwaram electricity burden might substansially come down due to the agreemnent from NTPC agreeing to supply under Rs 3/ per unit-. In perspective when the project was planned the unit price was upwards of Rs 8

Screenshot-2019-12-15-at-7-14-18-AM.png

Link to comment
Share on other sites

3 minutes ago, AndhraneedSCS said:

Good

Appudeppudo yearly electricity bill 10,000 crores vastadi annaru. Will it go down to 3500-4000 crores now?

 

 

Ichinappudu sooddam. Appatiki Malli Edo thirakasu pedatharu Edo rule seppi. 

Link to comment
Share on other sites

4 hours ago, AndhraneedSCS said:

Good

Appudeppudo yearly electricity bill 10,000 crores vastadi annaru. Will it go down to 3500-4000 crores now?

 

 

10k crores for only kaleshwaram is greatly exaggerated. May 10k for whole of existing lift irrigation and upcoming irrigation projects across the state. Overall the state requires 7000MW of power for lift irrigation and when unit was costing upwards of Rs 8 it was estimated it would cost approx 5k crores.

Kaleswaram project has some redundancies built into it. depending on the kind of monsoons we have  40% of the pumps can be turned off,  in a scenario if we have a good monsoon season in the upstream regions. For example SRSP got filled this year through natural water flow in the river and only when the water availability is low they will do a reverse pumping from a different point for example where the godavari river meets additional tribunaries(medigadda or treveni sangamam). SRSP is 90TMC and is the biggest reservoir in north TG and filling it would take few hundred crores. Similarly, yellampalli project got filled. Part of kaleshwaram is creating these redundancies where it can supplement a poor monsoon season and thus a creating a water grid of sorts eventually where one water source will supplement the other.  

Solar power and the new barrage which they commissioned last week on  Godavari is a multi-purpose irrigation project with the capacity to reserve 37 TMC of water. The project, which will be built at Dummugudem of Bhadradri Kothagudem district, will generate 320 megawatts of hydel power. As we move forward the next will phase will be operationalizing and  creating efficiencies wherever they can (we will end with with 5-6 barrages on godavari river and has potential to generate hydel power)

https://www.news18.com/news/india/telangana-govt-to-construct-another-multipurpose-project-on-godavari-river-2414897.html

floating solar panels proposed in one of the reservoirs to generate  power for pumping

https://telanganatoday.com/telangana-to-have-floating-solar-plants-to-power-li-projects

 

 

  • Upvote 2
Link to comment
Share on other sites

2 hours ago, hyperbole said:

Kaleshwaram electricity burden might substansially come down due to the agreemnent from NTPC agreeing to supply under Rs 3/ per unit-. In perspective when the project was planned the unit price was upwards of Rs 8

Screenshot-2019-12-15-at-7-14-18-AM.png

Very good move...Dora gave mission bhageeratha contract to bhel... actually that was the best policy decision in his entire first term...if wanted he could have given it to Pvt companies yet he didn't.....

Link to comment
Share on other sites

54 minutes ago, Gnan_anna said:

Very good move...Dora gave mission bhageeratha contract to bhel... actually that was the best policy decision in his entire first term...if wanted he could have given it to Pvt companies yet he didn't.....

2014 lo existing coal blocks auctions ni Supreme Court cancel chesinapudu, Loy of projects got stalled. Especially with BHEL who had lot of orders, suddenly there were no buyers. 
 

Dora ie time la Yadadri and other thermal projects capacity expansion ki fast ga move chesindu, chepalante chala wise and fast decision...

Regukar prices kante chala takuva pricing ki machinery and manpower vachindi...

 

Link to comment
Share on other sites

33 minutes ago, Android_Halwa said:

2014 lo existing coal blocks auctions ni Supreme Court cancel chesinapudu, Loy of projects got stalled. Especially with BHEL who had lot of orders, suddenly there were no buyers. 
 

Dora ie time la Yadadri and other thermal projects capacity expansion ki fast ga move chesindu, chepalante chala wise and fast decision...

Regukar prices kante chala takuva pricing ki machinery and manpower vachindi...

 

Yeah bro...actually bhel hyd plant ki vellaledhu orders these went to bhel Bhopal and haridwar plants , etla chusina it was a wise move...even the unions in bhel unanimously appreciated his decision...oka govt thana project kosam that too one of the major projects ki clear ga and fast ga decision thesukoni oka psu ki ivvadam annadhi ...we have to appreciate it.He can proudly say that this decision was taken without any ulterior motive ...only out of pure concern in reviving PSUs...things like these will go a long way in boosting the morale of the workforce...enduko Kani ee vishayam ekkuva highlight kaledhu media lo...

Link to comment
Share on other sites

2 minutes ago, Gnan_anna said:

Yeah bro...actually bhel hyd plant ki vellaledhu orders these went to bhel Bhopal and haridwar plants , etla chusina it was a wise move...even the unions in bhel unanimously appreciated his decision...oka govt thana project kosam that too one of the major projects ki clear ga and fast ga decision thesukoni oka psu ki ivvadam annadhi ...we have to appreciate it.He can proudly say that this decision was taken without any ulterior motive ...only out of pure concern in reviving PSUs...things like these will go a long way in boosting the morale of the workforce...enduko Kani ee vishayam ekkuva highlight kaledhu media lo...

That situation was like once in a decade type...coal blocks auction and re-tender, lot of projects got stalled because of this court order, 6 months  varaku motham works agipoinayi, NTPC works stalled, Power finance corporation degara unspent money vunde..

Dora played the game perfectly...3 months la motham clearences, financial closure, BHEL degara machinery  which was ready to dispatch, PFC degara finance with state back up...existing projects capacity expansion...and most importantly coal blocks auction suspension valla singareni ki faraq padakapoga, heavy demand for singareni which helped us to buy power from other grids after AP refused to sell power...

Sometimes, faster decision making process helps us a lot, it itself is an effient situation and look at now...no power cuts from 4 hour power cuts in hyderabad

Link to comment
Share on other sites

11 minutes ago, reality said:

endhi ee thread 2023 TRS Election campaign thread lekkundhi..,  🤔 

evadayya 2014 chesina paniki 2023 lo chepukuni votes adigedi ? 

ofcourse pulka gallu chepukuntaru anuko...

Link to comment
Share on other sites

4 hours ago, hyperbole said:

Kaleshwaram electricity burden might substansially come down due to the agreemnent from NTPC agreeing to supply under Rs 3/ per unit-. In perspective when the project was planned the unit price was upwards of Rs 8

Screenshot-2019-12-15-at-7-14-18-AM.png

Good Move

Kaleshwaram will be inspiration to other irrigation projects in India

Link to comment
Share on other sites

51 minutes ago, reality said:

endhi ee thread 2023 TRS Election campaign thread lekkundhi..,  🤔 

Kaleshwaram kani, Palamuru and Ranga Reddy kani sakkaga implement chesthe 2023 lo kuda TRS vache chances unnayi

Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

×
×
  • Create New...