Jump to content

chattisgarh lo current konukkoavadam entra nee pindakoodu


aakathaai789

Recommended Posts

7 minutes ago, bhaigan said:

Why jaggu helping manollu ?

not 100% but stop looking everything from the perspective of commission ..andhra didn’t invest in new plants in the last 5 years..when AP bifurcated it got a lion share since most of the then existing plants were based out of AP. with time there is a growing demand of power consumption..this will be a stop gap to arrest the demand

Link to comment
Share on other sites

1 minute ago, hyperbole said:

not 100% but stop looking everything from the perspective of commission ..andhra didn’t invest in new plants in the last 5 years..when AP bifurcated it got a lion share since all the then existing were based out of AP. with time there is a growing demand of power consumption..this will be a stop gap to arrest the demand

Agreed

Link to comment
Share on other sites

10 minutes ago, bhaigan said:

Why jaggu helping manollu ?

Every year, AP's power demand growth is pegged at 11%. ante..installed capacity, produced power should also grow by 11% to meet this demand..

Unfortunately, AP did not invest much in power sector, forget about 11% annual growth in demand...ante as per the need, AP should have added about 1500-2000 MW installed capacity and increased production output by at least 1000 MW YOY between 2015-2019...edo solar add chesinaru kani all others have remained the same and in fact, production has taken a hit in existing plants..

three days back, AP has demand gap of 1000 MW and the day after, it was 300 MW and today, AP did not buy any power from exchange...

  • Thanks 1
Link to comment
Share on other sites

18 minutes ago, Android_Halwa said:

Every year, AP's power demand growth is pegged at 11%. ante..installed capacity, produced power should also grow by 11% to meet this demand..

Unfortunately, AP did not invest much in power sector, forget about 11% annual growth in demand...ante as per the need, AP should have added about 1500-2000 MW installed capacity and increased production output by at least 1000 MW YOY between 2015-2019...edo solar add chesinaru kani all others have remained the same and in fact, production has taken a hit in existing plants..

three days back, AP has demand gap of 1000 MW and the day after, it was 300 MW and today, AP did not buy any power from exchange...

Adenti kaka baboru npedda pedda solar City lu kattadu ga

@snoww kaka PPT pls

Link to comment
Share on other sites

32 minutes ago, Hydrockers said:

Adenti kaka baboru npedda pedda solar City lu kattadu ga

@snoww kaka PPT pls

Oka Chettu peragaalante vitthanam veyagane peragadhu - CBN vitthanam naataadu, Jagan konchem neellu posthey chaalu - Ego kosam Chettu ni vere place ki maarchaalani chudakudadhu !!

Chettu perigithe - thara tharaalu aa mangoes ni kosukoni thinochu !! 

  • Haha 1
Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

×
×
  • Create New...