Jump to content

Best SOuth INdian cities according to you veyyandi..


ARYA

Recommended Posts

Just now, panipoori said:

MMTS useful antunnava? khali tirugutaayi bro aaa trains and also station kuda khaligaa vntndi

yes. nenu okka saari Hyd ochinappudu I think I went from lakdikapul to jntu or something. I forgot. total khaali train.

4yrs back le. may be not peak hr emo anukunna.

Link to comment
Share on other sites

2 minutes ago, Kool_SRG said:

Okkappudu kaali ippudu baane undi occupancy... Occupancy lekunte enthuku run chestaarantaav. 

 

Chennai lo timing tho sambandham lekunda tirugutaaru janalu

Link to comment
Share on other sites

3 minutes ago, panipoori said:

 

Chennai lo timing tho sambandham lekunda tirugutaaru janalu

More over expansion is planned Secunderabad to ghatkesar and secunde bolarum and medchal daaka already medchal daaka electrification kuda almost 80% daaka done... 

Link to comment
Share on other sites

17 minutes ago, Kool_SRG said:

More over expansion is planned Secunderabad to ghatkesar and secunde bolarum and medchal daaka already medchal daaka electrification kuda almost 80% daaka done... 

Dabuulu bokkaa....they can scrap the whole MMTS

Link to comment
Share on other sites

47 minutes ago, panipoori said:

Dabuulu bokkaa....they can scrap the whole MMTS

wrong. the current patronage is about 2 lakh people per day.

phase 2 open ayite malkajgiri to hitec city line estalish ayitadi..the patronage might go up to 3 lakh per day

Link to comment
Share on other sites

10 minutes ago, hyperbole said:

wrong. the current patronage is about 2 lakh people per day.

phase 2 open ayite malkajgiri to hitec city line estalish ayitadi..the patronage might go up to 3 lakh per day

that is like less than 10% of chennai daily ridership and  2 % of  mumbai's daily

Link to comment
Share on other sites

16 minutes ago, panipoori said:

that is like less than 10% of chennai daily ridership and  2 % of  mumbai's daily

MMTS was intended to connect western suburbs(industrial towns like BHEL, Lingampally etc) with the city and was never a main stream thing. With those suburbs now almost merged into the city limits we started seeing the ridership go up..With Phase 2 nearly will add another 84 kms to the existing 43 kms and more over phase connect 2 connects eastern suburbs with the central and western business districts. I will not be surprised if the patronage will double once the phase 2 opens. 

The first section of MMTS came up along Secunderabad-Lingampally (23 km), Hyderabad – Lingampally (24 km) in 2003 and Secunderabad – Faluknuma (14.54 km) in 2004.

MMTS Phase- II project has been proposed for a distance of 84 km on various stretches including Secunderabad-Moula Ali–Ghatkesar, Secunderabad–Bolarum-Medchal, Moula Ali– Sanathnagar and Tellapur–Ramchandrapuram.

MMTS-snip.png

Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

×
×
  • Create New...