ఉమ్మడి ఏపీని దాటేసిన తెలంగాణ


hyperbole

Recommended Posts

Ae mata ki a mata...credit goes to Dora..! 

2014-2015 lo eni challenges vunde state ki concerning electricity ....kinda mida pandi, pakka state koni, sonthanga katti edo okati denamma iyala ie stage la vunnam..

Idantha oka vaipu aithe Dameracherla inka start kaledu...Shaan-e-Telangana a project...just matter of few more months, Dameracherla power production shuru aitadi...atarvata Telangana will be one such state where we could witness fall in industrial power tariffs...a big revolution in industrial sector.

  • Upvote 1
Link to comment
Share on other sites

In state electricity generation entha as of now ?

how much we get from Grid ? ee data  on an avg basis evari deggaraina info untey veyyandi

I want to know if TG has been adding capacity on par with the demand 

Its good the demand has surged and govt is meeting it without powercuts but only being power surplus states and being able to manage , less dependency  on grid is what  will bring commercial production factories to TG  

Link to comment
Share on other sites

4 minutes ago, Android_Halwa said:

Ae mata ki a mata...credit goes to Dora..! 

2014-2015 lo eni challenges vunde state ki concerning electricity ....kinda mida pandi, pakka state koni, sonthanga katti edo okati denamma iyala ie stage la vunnam..

Idantha oka vaipu aithe Dameracherla inka start kaledu...Shaan-e-Telangana a project...just matter of few more months, Dameracherla power production shuru aitadi...atarvata Telangana will be one such state where we could witness fall in industrial power tariffs...a big revolution in industrial sector.

U should give some credit to baboruu tooo

Link to comment
Share on other sites

3 minutes ago, sattipandu said:

In state electricity generation entha as of now ?

how much we get from Grid ? ee data  on an avg basis evari deggaraina info untey veyyandi

I want to know if TG has been adding capacity on par with the demand 

Its good the demand has surged and govt is meeting it without powercuts but only being power surplus states and being able to manage , less depndency  on grid is what  will bring commercial production factories to TG  

There is a live dash board by union power ministry which gives you insight about power availability, consumption, demand, gap and market exchange price. Its a live board with data being refreshed every 15 mins.

http://vidyutpravah.in/

http://vidyutpravah.in/state-data/telangana

Historical demands,supply ki kuda oka data source vuntunde power ministry lo...annual consumption ani every year release chesetollu ..

 

  • Upvote 1
Link to comment
Share on other sites

5 minutes ago, sattipandu said:

In state electricity generation entha as of now ?

how much we get from Grid ? ee data  on an avg basis evari deggaraina info untey veyyandi

I want to know if TG has been adding capacity on par with the demand 

Its good the demand has surged and govt is meeting it without powercuts but only being power surplus states and being able to manage , less dependency  on grid is what  will bring commercial production factories to TG  

We are still buying power but Kakatiya and Kothagudem la existing projects capacity increase chesi production full scale lo vunayi...So pretty much by ading 1200-1300 MW in 2016-2018 has added to existing demand but gap was at 2000 MW

Bhadradri and Yadadri phase wise ie year end nundi start...so we will be adding about 1000 MW each year for the next 4 years to existing capacity.

So next 4-5 years ki, increased demand ki tagga supply vuntadi TG la...

  • Upvote 1
Link to comment
Share on other sites

15 minutes ago, sattipandu said:

In state electricity generation entha as of now ?

how much we get from Grid ? ee data  on an avg basis evari deggaraina info untey veyyandi

I want to know if TG has been adding capacity on par with the demand 

Its good the demand has surged and govt is meeting it without powercuts but only being power surplus states and being able to manage , less dependency  on grid is what  will bring commercial production factories to TG  

We are buying power 1000MW power from   Chattisgadh and rest is being procured from with in the state from private players and  from governments own investments done 6 years ago

Link to comment
Share on other sites

10 minutes ago, hyperbole said:

We are buying power 1000MW power from   Chattisgadh and rest is being procured from with in the state from private players and  from governments own investments done 6 years ago

I think we are buying more than 1000 MW...I think 3000 MW. 

2014-2019 varaku capacity increase ayindi about 1200-1400 MW ae TG lo....Actual capacity addition will be realised towards the end of 2020.

  • Upvote 1
Link to comment
Share on other sites

6 minutes ago, Android_Halwa said:

I think we are buying more than 1000 MW...I think 3000 MW. 

2014-2019 varaku capacity increase ayindi about 1200-1400 MW ae TG lo....Actual capacity addition will be realised towards the end of 2020.

Ledu kaka 1000MW with chattisgarf

http://www.tserc.gov.in/file_upload/uploads/Orders/Commission%20Orders/2017/Chhattisgarh-PPA.pdf

In state solar capacity from 100mw in 2014 has gone 3800mw by end of 2018/2019

2020 Aipoye sariki -5GW projection 

https://www.thehindubusinessline.com/economy/telangana-to-have-5-giga-watt-solar-power-capacity-by-2020/article29323051.ece

Link to comment
Share on other sites

6 minutes ago, hyperbole said:

Ledu kaka 1000MW with chattisgarf

http://www.tserc.gov.in/file_upload/uploads/Orders/Commission%20Orders/2017/Chhattisgarh-PPA.pdf

In state solar capacity from 100mw in 2014 has gone 3500mw by end of 2018/2019

I meant Chattisgarh nundi 1000 MW kakunda additional ga grid nundi additional withdraw chestunnam

Solar vachesi its just 1MW...Or at least as per TG Genco, Solar is 1 MW only

https://www.tsgenco.co.in/getInfo.do

  • Upvote 1
Link to comment
Share on other sites

5 minutes ago, Android_Halwa said:

I meant Chattisgarh nundi 1000 MW kakunda additional ga grid nundi additional withdraw chestunnam

Solar vachesi its just 1MW...Or at least as per TG Genco, Solar is 1 MW only

https://www.tsgenco.co.in/getInfo.do

1000MW govt owned anukunta

3800MW also counts your roof top panels and 180 private players

all roof top solar power panels are connected to the grid and they withdraw back from the grid for consumption. If they get any money is from the delta

Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

×
×
  • Create New...