49 minutes ago, hyperbole said:

Laddulodi prati okkadu civil engineer architect le ekkada.

basically it is done on purpose to   Keep in sync contour below(if not they might have had to level the road below or further elevate and extend to drop the flyover). May be something compelled them to do as part of the physics involved and budgetary concerns. Zoom in on the pic to see the contour below. We are taking about road no 45 which is hill with uneven surface(flyover is 2kms long)

 

EiL9dn8U4AADNEU?format=jpg&name=large

Nuvvuemina cheppu va hyd la standards are not great this design looks like a flaw and dangerous. Aa PVNR express way also not great so many sharp turns. Ekkada chudaledu ilanti flyovers cheap civil engineering

Link to comment
Share on other sites

40 minutes ago, hyperbole said:

Here is a pic of Hyd Metro which follows the contour of the road below, there should be some reasoning that someone civil and structural backgroud can answer 

EiL9eFoU4AEHMwe?format=jpg&name=medium

Ya I don’t know but digudu unna deggara pillars height penchi ethu deggara pillars height tagginchi flat ga build cheyochu kada road etla unte atla vankaralu timpuru yendi gee lafut design

Link to comment
Share on other sites

59 minutes ago, pahelwan said:

Nuvvuemina cheppu va hyd la standards are not great this design looks like a flaw and dangerous. Aa PVNR express way also not great so many sharp turns. Ekkada chudaledu ilanti flyovers cheap civil engineering

The corporation has compromised on the design of the Jubilee Hills Road No 45 flyover which leads to the hanging bridge at Durgam Cheruvu. (Representational image)

Hyderabad: Despite the Bio-Diversity flyover having claimed four lives in less than three weeks, the Greater Hyderabad Municipal Corporation has been compromising on safety standards on another flyover constructed under the Strategic Road Development Plan (SRDP).

The corporation has compromised on the design of the Jubilee Hills Road No 45 flyover which leads to the hanging bridge at Durgam Cheruvu. The civic body, which earlier planned to construct a six-lane elevated corridor by widening the road up to 120 feet, has now restricted it to four lanes by widening the road only up to 100 feet.

An official claimed that the road widening was restricted only to minimise land acquisition costs. But it could endanger the lives of motorists, about 2.4 lakh of whom are expected to take the road daily.

According to highly placed sources in the corporation, the design change could be dangerous even though the flyover has been built in compliance with Indian Roads Congress (IRC) norms.

Like the Bio-Diversity flyover, the Jubilee Hills Road No 45 also has a steep curve at Dr B.R. Ambedkar Open University, which is very prone to accidents, even though the height of the crash barriers has been raised, sign boards indicating the speed limit have come up and rumble strips have been added. Sources said that despite a warning from the independent committee which was formed after the Biodiversity flyover tragedy, the GHMC has done nothing about the dangerous curve.

The independent committee in its report stressed that the width of the curve should be enhanced though it was constructed on par with IRC guidelines.

When queried about the same, a senior GHMC official, requesting anonymity, said that the corporation did not change the design, rather the width of the road beneath the flyover has been compromised upon. The official said that the corporation will take additional care at the curve at Dr B.R. Ambedkar Open University.

"The civic body has instructed the private agency that is maintaining the flyover to increase the height of the crash barrier, install rumble strips, and put sign boards to control the speed limit as specified by the

independent expert committee report. We have already laid 43 piers out of 53. Remaining 10 piers have rocky terrain underneath so it will take us two additional months to lay the foundation. The corporation will complete the construction by May and traffic will be allowed on the cable stayed bridge at Durgam Cheruvu only after completion of Jubilee Hills Road No 45 flyover,” the official added.

Link to comment
Share on other sites

1 hour ago, pahelwan said:

Nuvvuemina cheppu va hyd la standards are not great this design looks like a flaw and dangerous. Aa PVNR express way also not great so many sharp turns. Ekkada chudaledu ilanti flyovers cheap civil engineering

India la roads emmana straight untaya kaka, they are solving an engineering problem the best way they can in their allocated  budgets. Land acquisition is an issue as well.

enta cheptunnaru monna open ayina Durga Gudi fly over enni vanakarau unnayi choosinava? Kondapur flyover vanakalu pettinaru same social media enginnerlu ippudu gup chup

EKEBOBZUYAIz-eY?format=jpg&name=900x900
Link to comment
Share on other sites

5 minutes ago, hyperbole said:

India la roads emmana straight untaya kaka, they are solving an engineering problem the best way they can in their allocated  budgets. Land acquisition is an issue as well.

enta cheptunnaru monna open ayina Durga Gudi fly over enni vanakarau unnayi choosinava? Kondapur flyover vanakalu pettinaru same social media enginnerlu ippudu gup chup

EKEBOBZUYAIz-eY?format=jpg&name=900x900

Assalina Hyderabad development ento memu chestam ani cheppina TRS vallu esina estunna roads without any drainage facility for rain water kuda architecture wonder a na telugu GIF

Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

×
×
  • Create New...