Jump to content

Nagarjuna Sagar ::: BiElection Predictions


RPG_Reloaded

Recommended Posts

11 minutes ago, tom bhayya said:

lol 24 hours free electricity is different from claiming TRS govt ey 24 hours eletricity local ga generate chesi isthundhi ani , TG antha electricity own ga geneate cheyagaliguthey why is it opposing central reforms ?

free power ni states discoms meeda vestunaru and money ivvatam ledu 

discoms are in deep financial trouble all over india 

Link to comment
Share on other sites

2 minutes ago, tom bhayya said:

NDA ichina power ni vaadukunta memu surplus anukuntunnaru inko 2 years time pattudhi for TG to claim that its producing more than it can consume appativaraku appreciate center efforts

Just google or fo to TS electricity website than talk all this crap without knowing , TG has only one power agreement from out of state that is with chattiagadh for 1000mw. TG funded close to 1 lakh crores and in next 3 years the generation capacity is bound to go up by 28300MW

  • Upvote 2
Link to comment
Share on other sites

3 minutes ago, manadonga said:

free power ni states discoms meeda vestunaru and money ivvatam ledu 

discoms are in deep financial trouble all over india 

Andhukey free power ki meters and billing reforms , very good for the industry . 

2016 nunchi free power ki dabbulu ivvaledhu anta AP lo , now they must reimburse the farmers or face revolt

Link to comment
Share on other sites

1 minute ago, hyperbole said:

Just google or fo to TS electricity website than talk all this crap without knowing , TG has only one power agreement from out of state that is with chattiagadh for 1000mw. TG funded close to 1 lakh crores and in next 3 years the generation capacity is bound to go up by 28300MW

You are right TG added a lot of power capacity after separation , 2014 lo 3 hours power cut andhari marchipoyaru emo . 

But that capacity addition is also a big problem now ...solar power is far cheaper and the utilisation of co power plants  have dropped by a lot , so much so that many private players are facing bankruptcy .  

Link to comment
Share on other sites

 

Hyderabad: Telangana will soon emerge as the top power producing State in the country with installed electricity generation capacity expected to touch 27,603 MW, Power Minister G Jagadish Reddy said on Tuesday. The installed capacity of the Telangana was a mere 7,700 MW at the time of State formation in 2014, he pointed out.
 

We completed projects such as 600 MW Bhupalpally, 120 MW Pulichintala, 800 MW KTPS, 1200 MW Singareni, 270 MW Bhadradri first unit and entered into an agreement with Chhattisgarh for supply of 1000 MW,” he said. He said that the State improved solar production from 71 MW at the time of bifurcation to 3,725 MW now, pole-vaulting Telangana to the top four position in the country in solar power generation.

The State which had only 7,700 MW of installed capacity reached 15,888 MW in six years of time, adding over 8110 MW, the Minister said. He added that soon after the completion of the 4000 MW Yadadri ultra thermal power plant, 810 MW of Bhadradri (3 units),  4000 MW of NTPC Ramagundam, 800 MW Singareni, 1723 Solar power and 382 from CGS the State will reach 27,603 MW installed capacity making it the top State to have such installed capacity and also in surplus power.

Link to comment
Share on other sites

2 minutes ago, Ryzen_renoir said:

You are right TG added a lot of power capacity after separation , 2014 lo 3 hours power cut andhari marchipoyaru emo . 

But that capacity addition is also a big problem now ...solar power is far cheaper and the utilisation of co power plants  have dropped by a lot , so much so that many private players are facing bankruptcy .  

Telangana is top 2-4 solar power state in the country at the moment. In 2014 we had 75MW through solar and now 3800MW

  • Upvote 1
Link to comment
Share on other sites

5 minutes ago, hyperbole said:

Just google or fo to TS electricity website than talk all this crap without knowing , TG has only one power agreement from out of state that is with chattiagadh for 1000mw. TG funded close to 1 lakh crores and in next 3 years the generation capacity is bound to go up by 28300MW

just go back to your records and check AP genco ki TG entha baaki undho for power first dont drag me into tha ugly fight 

Link to comment
Share on other sites

2 minutes ago, hyperbole said:

 

Hyderabad: Telangana will soon emerge as the top power producing State in the country with installed electricity generation capacity expected to touch 27,603 MW, Power Minister G Jagadish Reddy said on Tuesday. The installed capacity of the Telangana was a mere 7,700 MW at the time of State formation in 2014, he pointed out.
 

We completed projects such as 600 MW Bhupalpally, 120 MW Pulichintala, 800 MW KTPS, 1200 MW Singareni, 270 MW Bhadradri first unit and entered into an agreement with Chhattisgarh for supply of 1000 MW,” he said. He said that the State improved solar production from 71 MW at the time of bifurcation to 3,725 MW now, pole-vaulting Telangana to the top four position in the country in solar power generation.

The State which had only 7,700 MW of installed capacity reached 15,888 MW in six years of time, adding over 8110 MW, the Minister said. He added that soon after the completion of the 4000 MW Yadadri ultra thermal power plant, 810 MW of Bhadradri (3 units),  4000 MW of NTPC Ramagundam, 800 MW Singareni, 1723 Solar power and 382 from CGS the State will reach 27,603 MW installed capacity making it the top State to have such installed capacity and also in surplus power.

you are missing simple point NTPC 

Link to comment
Share on other sites

1 minute ago, tom bhayya said:

just go back to your records and check AP genco ki TG entha baaki undho for power first dont drag me into tha ugly fight 

Malla topic deviate chestunnavu.  AP and TG have had bifurcation issues and nothing to with current status quo, if anything AP hijacked power projects who had in principle agreement to supply power to TG after the bifurcation which they went back on and hence was compelled to with Chattiagadh

  • Upvote 1
Link to comment
Share on other sites

10 minutes ago, NiranjanGaaru said:

Prediction iche mundu candidatelu evaro chepandi man @RPG_Reloaded @csrcsr @hyperbole @tom bhayya

@manadonga

All my predictions were right upto now, 

Biden win in 2020

NDA win in bihar with 135+ but closely came 

Dubbaka not predicted anything, neck and neck I said

 

@dewarist   ee comedy susaava all his predictions were right anta... paina 3 chepthe okati ayyindi dhaaniki mundu track record telisindhe ga...

Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

×
×
  • Create New...