Balanagar Flyover - a major traffic roadblock cleared with this flyover.

status -  to be inaugurated next month

 

Uppal flyover - 7.5 KMs long flyover 

status -  land acquisition completed and cleared. 30-35% completed. targeted atleast 2 more years


LB nagar RHA underpass and flyover.

status- LHS(left side) floyover and under pass were completed last year and thrown open to public. RHS underpass and flyover in progress - 1 year away


Nagole : 1 year away


Nalgonda cross roads/owaisi junction - at least 1 year away

 

Chancalguda 


shamshabad - 1 year

 


RTC crossroads - 2 years away

  • Like 1
  • Upvote 1
Link to comment
Share on other sites

Hitech city finance district- Hyderabad’s most complex flyover - multi ramp and multi level - ramps to ORR

 

Shaikpet


kondapur


kokapet is getting an exit and junction from ORR

2021-06-14-22_33_29-png.1641497

  • Like 1
Link to comment
Share on other sites

To ease traffic, Hyderabad development body to widen service roads parallel to ORR

Plan on to overlay a bitumen road from Gachibowli to Shamshabad; projects to cost an estimated Rs 302.21 crore.

flip.pngfb.pngtwitter.pngmail.png

Published: 11th June 2021 10:37 AM  |   Last Updated: 11th June 2021 10:37 AM  |  A+A-

A service road from Narsingi to Kollur

A service road from Narsingi to Kollur | VINAY MADAPU

Express News Service

HYDERABAD: The Hyderabad Growth Corridor Limited (HGCL), a wing of the Hyderabad Metropolitan Development Authority (HMDA), has decided to widen the existing service roads from Nanakramguda to Telangana State Police Academy (TSPA), and Narsingi to Kollur, as well as to overlay a bitumen road from Gachibowli to Shamshabad, all at an estimated cost of Rs 302.21 crore.

The widening of service roads is expected to ease traffic around Nanakramguda, Narsingi, Kokapet, Kollur, Tellapur, Madhapur, Kismatpur, and TSPA, as massive developmental activities have been coming up in the area. Many commuters also take the narrow service roads of the Outer Ring Road (ORR) to reach Hitech City, Madhapur, Financial District, Gachibowli and other areas, leading to constant traffic snarls. 

Widening the two-lane service roads from Nanakramguda to TSPA and Narsingi to Kollur (covering a total length of 48 km) into four-lane will cost an estimated Rs 234.18 crore. Overlaying a bitumen road from Gachibowli to Shamshabad (covering a total length of 24-25 km), will cost an estimated Rs 68.02 crore. The widening of the outer service road has been proposed with a 2x2 lane carriageway of 7.5 metres each, with a footpath of 2.5 metres towards the outer edge. There will be a central divider of one metre width, drains 2.5 metres wide on either sides (one side with retaining wall), utility corridor 4 metres wide, etc.

The ORR is part of the IT corridor, mainly along the link road from Gachibowli to Narsingi, towards Shamshabad International Airport, Kollur, and Nanakramguda. This has resulted in many national and international IT and ITES offices, software companies, shopping complexes and residential apartments to come up close to the ORR.

 

As a result, many techies have made areas like Madhapur, Gachibowli, Nanakramguda, Kokapet, Narsingi, Kollur, and Tellapur into their homes, leading to a sudden increase in population density in these localities. The ORR main carriageway was laid with eight lanes. However, the service roads on both sides were built with two lanes. With the increase in population in the above areas, traffic congestion during the peak hours has become a routine occurrence, leading the HMDA to take the decision to widen the service roads at the earliest.

PROJECT TO BE COMPLETED IN 15 MONTHS
The HGCL has invited tenders for the projects, and once the agency is finalised, the work should be completed in a span of 15 months. The widening of the outer service road has been proposed with a 2x2 lane carriageway of 7.5 metres each

Link to comment
Share on other sites

10 minutes ago, jawaani_jaaneman said:

Pandemic vunna ie works anni full fledge ga aitunatu vunayi...

This is the time to invest more and more in infra and civic amenities.

Yes but worst time to be living in IT corridor area, my cousin is living in kokapet and complaining about air pollution because of excessive construction and blasting activity. However that area is up for a massive transformation and will look like some affluent city 3-4 years from now

Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

×
×
  • Create New...