Jump to content

Result of Godi interference in American politics: After Boeing betrayal, DRDO to build it's own High Altitude Engine test facility


JackSeal

Recommended Posts

The order for the C-17 Globemaster III heavy lift aircraft were placed after then US President Barack Obama personally pleaded with then PM Manmohan Singh to buy the aircraft as otherwise the Boeing plant in Long Beach, California would have to be shut down. Thereby and affecting re-election prospects in a tough election with Mitt Romney. Biden was a part of that administration and look at how his administration now behaves. And whatever happened to 56s friendship with Dolund.

Boeing was to establish a High Altitude Engine Test Facility as well as a Trisonic Wind Tunnel Facility at India’s Defense Research and Development Organization (DRDO) as part of its offset obligation for the ten C-17 Globemaster III heavy-lift aircraft that were ordered by the Indian Air Force for USD 4.116 billion way back in 2011.

https://www.theigmp.org/2022/01/after-boeing-betrayal-drdo-to-built-its-own-high-altitude-engine-test-facility.html

Link to comment
Share on other sites

bokkalo Boeing factory museyalsi vastadi ani Obama gadu adukkunte place chesina order

ippudu balisi kottukuntunnaru orders to anduke cancel chesaru

daniki interference endi na matta

Link to comment
Share on other sites

The order for the C-17 Globemaster III heavy lift aircraft were placed after then US President Barack Obama personally pleaded with then PM Manmohan Singh to buy the aircraft as otherwise the Boeing plant in Long Beach, California would have to be shut down

Yerrifukodu MMS karigipoyi vaalladhi shut down avvakudadhani konnaada 🤣🤣🤣 - adhhedho appudey DRDO ki funds ichi cheyandi ra antey ayipoye kadha musali na koduku vaadidhi em poye, janam Dabbulu Ega anukunnaAda 

Link to comment
Share on other sites

Vodiyamma, vaadi losses ni cover chesuko tam kosam mana tho konipinchi malli US approval ivvaalanta exports kosam and 10yrs ayyindhi, contract lo oka timeline antu kuda pettuko ledhaa yerrifukodu MmS @3$%

Evadra eedu oka peddha economist annadhi and sincere annadhi, madichi *&Y&

Link to comment
Share on other sites

10 hours ago, Spartan said:

bokkalo Boeing factory museyalsi vastadi ani Obama gadu adukkunte place chesina order

ippudu balisi kottukuntunnaru orders to anduke cancel chesaru

daniki interference endi na matta

mee pill pooo minister jayashankar gadu aa RSS batch entha athi chesthe gaani order cancel avvadu....urike fake propaganda seyyaku. balisi kottukuntunnavu baaga .

Link to comment
Share on other sites

15 minutes ago, JackSeal said:

errifook contract endhi ra jaffa… monna Covid appudu ave aircraft vadaru kada ra 

IAF-oxygen-airlifting-1.jpg

Nenu annadhi planes ni kaadhu ra annadhi - vaaadidhi shutdown ayipothundhani veedu konnaada 😂😂😂 

Link to comment
Share on other sites

1 minute ago, ZoomNaidu said:

Nenu annadhi planes ni kaadhu ra annadhi - vaaadidhi shutdown ayipothundhani veedu konnaada 😂😂😂 

avi delivery apudu me whatsapp university godi goose bumps tho vugipoyaru kada 

Link to comment
Share on other sites

1 minute ago, JackSeal said:

avi delivery apudu me whatsapp university godi goose bumps tho vugipoyaru kada 

Arey aa contract raasukotam endhi ra 😂😂 -  oka time limit lekunda, manamey Konaali, vaadu approval ivvaali malli naa Mattakay lo contracts raasukoney India ni sankanaakinchaaru Congrass galeez gaallu,  nuvvu mundhey cover drive tho modi interference ani chepppi sollu chebuthunnaav @3$%

slaverism ki kuda limit ledha ra Ricebag isthey chaalu, polomani jeevitham mottham rasi chesthaaru !!

Link to comment
Share on other sites

24 minutes ago, JackSeal said:

errifook contract endhi ra jaffa… monna Covid appudu ave aircraft vadaru kada ra 

IAF-oxygen-airlifting-1.jpg

Boeing was to establish a High Altitude Engine Test Facility as well as a Trisonic Wind Tunnel Facility at India’s Defense Research and Development Organization (DRDO) as part of its offset obligation for the ten C-17 Globemaster III heavy-lift aircraft that were ordered by the Indian Air Force for USD 4.116 billion way back in 2011
 

covid planes ki ee topic ki sambandham endho ra 😂😂 neekey ardham avvaali. 

Link to comment
Share on other sites

2 minutes ago, ZoomNaidu said:

Boeing was to establish a High Altitude Engine Test Facility as well as a Trisonic Wind Tunnel Facility at India’s Defense Research and Development Organization (DRDO) as part of its offset obligation for the ten C-17 Globemaster III heavy-lift aircraft that were ordered by the Indian Air Force for USD 4.116 billion way back in 2011
 

covid planes ki ee topic ki sambandham endho ra 😂😂 neekey ardham avvaali. 

ee article (transfer of technology) is part of that same deal ra jaffa… the same planes were used for many missions ani telling when you said erri fook deal 

Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

×
×
  • Create New...