Jump to content

Hi Speed rail eppudu kadthunnaru India lo?


Raven_Rayes

Recommended Posts

4 minutes ago, alpachinao said:

budget ledu bodi degara 😂

mumbai ahdmedabad maatram kadthunnaranta.. expected to finish by 2028.

pani lo pani migatha vi kooda kattochu lafoot gaallu.

thokkalo city lopala flyovers, cities ki paniki rani metro ivanni maanesi.

 

Link to comment
Share on other sites

5 minutes ago, veerigadu said:

Cuttt bullllll aaa sannasuluuuu pelchestheeee. Faisal waste aythayyyy gaaa. Andukeee bakthsss waiting

first city metro stations lo pettali ra bomb lu.

ee overaction thattuko leka unnam. car lp poye yedhava sannasula kosam 'public transport' anta.

Link to comment
Share on other sites

1 minute ago, Raven_Rayes said:

mumbai ahdmedabad maatram kadthunnaranta.. expected to finish by 2028.

pani lo pani migatha vi kooda kattochu lafoot gaallu.

thokkalo city lopala flyovers, cities ki paniki rani metro ivanni maanesi.

 

Anni cities ki okatesari kattalante kastamemo kada...

  • Haha 1
Link to comment
Share on other sites

feasibility studies have to be made before that can be done..

i dont think they are ready to spend on that yet..

once the mum-ahm is run, then we will get clear picture of it, how much worth it is.

Link to comment
Share on other sites

3 minutes ago, Android_Halwa said:

Anni cities ki okatesari kattalante kastamemo kada...

kastam aithey, country ni disband cheyyamanu waste gaallani. sollu vinaleka sasthunnam

china chesindhi, veellu antha kastapadi Hindutva chethha ni spread chesedhi enduku? kaneesam aa social/political capital ni ilanti projects ki kooda vaadalera? lol.

Link to comment
Share on other sites

1 minute ago, Android_Halwa said:

Hi speed trail ki...hindutva ki...country disband..

ediki potunav setu ? chetiki rakunda potunav..

nuvvu chaala slow guru. nannu catch seyyatam nee valla kaadhu.

neeku chinna pilladiki seppinattu cheppey opika naaku ledhu.

Hindutva paisa ki prayojanam leni chethha, if they can't use it to build mega infra projects. Its not like the Indian middle class is against such projects.

intha conservative desham, that is afraid to spend on infra, untey entha disband aithey entha.

Link to comment
Share on other sites

https://en.wikipedia.org/wiki/Expressways_of_India

A lot of focus currently on roadways

Total length listed in this table is 10,647.524 km (6,616.065 mi).

 
Name States Length (km/mi) Expected Date of Completion
Total 10,647.524 km (6,616.065 mi)
Ahmedabad–Dholera Expressway Gujarat 110 km (68 mi) 2023 March
Airoli–Katai Naka Freeway Maharashtra 12.3 km (7.6 mi) 2023 March
Amritsar–Jamnagar Expressway[40] Punjab, Haryana, Rajasthan, Gujarat 1,257 km (781.1 mi) 2023 March
Amritsar Ring Road[41] Punjab 98 km (60.9 mi) 2022
Bangalore–Chennai Expressway[42] Karnataka, Andhra Pradesh, Tamil Nadu 258 km (160.3 mi) 2024 March
Bangalore–Mysore Infrastructure Corridor[43] Karnataka 111 km (69.0 mi) 2022 August
Bundelkhand Expressway[44] Uttar Pradesh 296 km (183.9 mi) 2022 April
Chennai Port–Maduravoyal Expressway[45] Tamil Nadu 19 km (11.8 mi) 2023
Coastal Road (Mumbai) Maharashtra 29.2 km (18.1 mi) 2022 June
DND–KMP Expressway Delhi, Haryana 59 km (37 mi) 2023
Delhi–Amritsar–Katra Expressway[46] Delhi, Haryana, Punjab, Jammu and Kashmir 687 km (427 mi) 2023 December
Delhi–Mumbai Expressway[47] Delhi, Haryana, Rajasthan, Madhya Pradesh, Gujarat, Maharashtra 1,350 km (840 mi) 2023 March
Dwarka Expressway Delhi, Haryana 27.6 km (17.1 mi) 2022 August
Faridabad–Noida–Ghaziabad Expressway Delhi, Haryana, Uttar Pradesh 56 km (35 mi) 2023
Ganga Expressway(Meerut–Prayagraj) Uttar Pradesh 594 km (369.1 mi) 2024
Trans–Haryana Expressway (Ambala–Narnaul) Haryana 227 km (141.1 mi) 2022 March/April
Gorakhpur Link Expressway[48] Uttar Pradesh 91.35 km (56.8 mi) 2022 March
Lucknow–Kanpur Expressway* Uttar Pradesh 66 km (41 mi) 2023 October
Lucknow Outer Ring Road Uttar Pradesh 108 km (67 mi) 2022 June
Loknayak Ganga Path Bihar 39.5 km (24.5 mi) 2022 December
Ludhiana Elevated corridor Punjab 13 km (8.1 mi) 2024 March
Mumbai Trans Harbour Link Maharashtra 21.8 km (13.5 mi) 2022 June
Mumbai–Nagpur Expressway[49] Maharashtra 701 km (435.6 mi) 2022 May
Pathankot-Ajmer Expressway Punjab, Haryana, Rajasthan 600 km (370 mi) 2023 March
Peripheral Ring Road Karnataka 65.5 km (40.7 mi) 2024 August
Raipur–Visakhapatnam Expressway Chhattisgarh, Odisha, Andhra Pradesh 465 km (288.9 mi) 2024 March
Sohna Elevated Corridor[50] Haryana 21.65 km (13.5 mi) 2022
Varanasi Ring Road[51][52] Uttar Pradesh 63 km (39 mi) 2022
Wazirabad–Mayur Vihar Elevated Expressway Delhi NCR 18 km (11 mi) ?

 

Operational expressways[edit]

Only operational length and year of final completion is shown. Total length listed in this table is 2,074.5 km (1,289.0 mi). Note: AC = Access-Controlled Expressway.

Name States Length (km/mi) Lanes Year of Completion Remarks
Total 2,074.5 km (1,289 mi)
Purvanchal Expressway(AC)[20] Uttar Pradesh 340.8 km
211.8 mi
6 2021 November Longest Expressway in India
Agra–Lucknow Expressway (AC)[21] Uttar Pradesh 302.2 km
187.8 mi
6 2017 February 2nd Longest Expressway in India[22]
Yamuna Expressway (AC)[23][24] Uttar Pradesh 165.5 km
102.8 mi
6 2012 August  
Outer Ring Road, Hyderabad (AC)[25] Telangana 158 km
98.2 mi
8 2018 April  
Western Peripheral Expressway (AC) Haryana 135.6 km
84.3 mi
6 2018 November  
Eastern Peripheral Expressway (AC) Uttar Pradesh, Haryana 135 km
83.9 mi
6 2018 May NE2
Delhi–Meerut Expressway (AC)[26] Delhi, Uttar Pradesh 96 km
59.7 mi
6-14 2021 April NE3 India's widest Expressway (14-lane)[27]
Mumbai–Pune Expressway (AC)[28] Maharashtra 94.5 km
58.7 mi
6 2002 April India's First 6-lane wide expressway
Ahmedabad–Vadodara Expressway (AC)[29] Gujarat 93.1 km
57.8 mi
4 2004 August NE1
Jaipur–Kishangarh Expressway (AC)[30] Rajasthan 90 km
55.9 mi
6 2005 April Forms a segment of the NH-8
Ranchi Outer Ring Road Expressway (AC) Jharkhand 60 km
37.3 mi
6 2019 November First Expressway of Jharkhand
Chennai Bypass (AC)[31] Tamil Nadu 32 km
19.9 mi
4-6 2010  
Delhi–Gurgaon Expressway (AC)[32] Delhi, Haryana 27.7 km
17.2 mi
6-8 2008 January Part of Golden Quadrilateral
Noida–Greater Noida Expressway (AC)[33] Uttar Pradesh 24.5 km
15.2 mi
6 2002  
Belghoria Expressway (AC) West Bengal 16 km
9.9 mi
4 2008 Part of AH1
Raipur–Naya Raipur Expressway (AC) Chhattisgarh 12 km
7.5 mi
4 2019 First expressway of Chhattisgarh
P.V. Narasimha Rao Expressway (AC)[34][35] Telangana 11.6 km
7.2 mi
4 2009 October  
Panipat Elevated Expressway(AC)[36] Haryana 10 km
6.2 mi
6 2008 January  
Delhi–Noida Direct Flyway (DND) (AC)[37] Delhi, Uttar Pradesh 9.2 km
5.7 mi
8 2001 January India's First 8-lane wide expressway
Delhi–Faridabad Skyway (AC)[38][39] Delhi, Haryana 4.4 km
2.7 mi
6 2010 November Part of NH44
Link to comment
Share on other sites

4 minutes ago, MeraBharat_Mahan said:

https://en.wikipedia.org/wiki/Expressways_of_India

Total length listed in this table is 10,647.524 km (6,616.065 mi).

 
Name States Length (km/mi) Expected Date of Completion
Total 10,647.524 km (6,616.065 mi)
Ahmedabad–Dholera Expressway Gujarat 110 km (68 mi) 2023 March
Airoli–Katai Naka Freeway Maharashtra 12.3 km (7.6 mi) 2023 March
Amritsar–Jamnagar Expressway[40] Punjab, Haryana, Rajasthan, Gujarat 1,257 km (781.1 mi) 2023 March
Amritsar Ring Road[41] Punjab 98 km (60.9 mi) 2022
Bangalore–Chennai Expressway[42] Karnataka, Andhra Pradesh, Tamil Nadu 258 km (160.3 mi) 2024 March
Bangalore–Mysore Infrastructure Corridor[43] Karnataka 111 km (69.0 mi) 2022 August
Bundelkhand Expressway[44] Uttar Pradesh 296 km (183.9 mi) 2022 April
Chennai Port–Maduravoyal Expressway[45] Tamil Nadu 19 km (11.8 mi) 2023
Coastal Road (Mumbai) Maharashtra 29.2 km (18.1 mi) 2022 June
DND–KMP Expressway Delhi, Haryana 59 km (37 mi) 2023
Delhi–Amritsar–Katra Expressway[46] Delhi, Haryana, Punjab, Jammu and Kashmir 687 km (427 mi) 2023 December
Delhi–Mumbai Expressway[47] Delhi, Haryana, Rajasthan, Madhya Pradesh, Gujarat, Maharashtra 1,350 km (840 mi) 2023 March
Dwarka Expressway Delhi, Haryana 27.6 km (17.1 mi) 2022 August
Faridabad–Noida–Ghaziabad Expressway Delhi, Haryana, Uttar Pradesh 56 km (35 mi) 2023
Ganga Expressway(Meerut–Prayagraj) Uttar Pradesh 594 km (369.1 mi) 2024
Trans–Haryana Expressway (Ambala–Narnaul) Haryana 227 km (141.1 mi) 2022 March/April
Gorakhpur Link Expressway[48] Uttar Pradesh 91.35 km (56.8 mi) 2022 March
Lucknow–Kanpur Expressway* Uttar Pradesh 66 km (41 mi) 2023 October
Lucknow Outer Ring Road Uttar Pradesh 108 km (67 mi) 2022 June
Loknayak Ganga Path Bihar 39.5 km (24.5 mi) 2022 December
Ludhiana Elevated corridor Punjab 13 km (8.1 mi) 2024 March
Mumbai Trans Harbour Link Maharashtra 21.8 km (13.5 mi) 2022 June
Mumbai–Nagpur Expressway[49] Maharashtra 701 km (435.6 mi) 2022 May
Pathankot-Ajmer Expressway Punjab, Haryana, Rajasthan 600 km (370 mi) 2023 March
Peripheral Ring Road Karnataka 65.5 km (40.7 mi) 2024 August
Raipur–Visakhapatnam Expressway Chhattisgarh, Odisha, Andhra Pradesh 465 km (288.9 mi) 2024 March
Sohna Elevated Corridor[50] Haryana 21.65 km (13.5 mi) 2022
Varanasi Ring Road[51][52] Uttar Pradesh 63 km (39 mi) 2022
Wazirabad–Mayur Vihar Elevated Expressway Delhi NCR 18 km (11 mi) ?

North lone ekkuva kadtunnaru lawda gallu

Link to comment
Share on other sites

57 minutes ago, Raven_Rayes said:

kastam aithey, country ni disband cheyyamanu waste gaallani. sollu vinaleka sasthunnam

china chesindhi, veellu antha kastapadi Hindutva chethha ni spread chesedhi enduku? kaneesam aa social/political capital ni ilanti projects ki kooda vaadalera? lol.

nuvvu china velliporaa 

Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

×
×
  • Create New...