Jump to content

Telangana leads country in Renewable Energy installations, surpasses target


hyperbole

Recommended Posts

current kotalu enduke levu Telangana la, in 2014 state had a megre 100mw solar and now almost 5k installed RE capacity 

Hyderabad: Telangana has done stupendously well in the area of Renewable Energy (RE) installations, surpassing the 2022 RE capacity targets with the State achieving a mind-boggling 248 per cent in super fast time. The achievement is particularly significant since 27 States have not even achieved 50 per cent of their targets and will have to intensify their efforts drastically just to meet the targets.

With nine months left until December 2022, only three States and one union Territory hit the 100 per cent RE target. Among these, Telangana recorded 248 per cent followed by Rajasthan – 119 per cent, Karnataka – 107 per cent and Andaman and Nicobar – 129 per cent, EmberClimate, a Community Interest Company, registered in England, reported in a tweet.

The company analysed State-wise installed RE capacity and RE targets for 2022. According to Ember’s report, many Indian States with high power demand are currently 50 per cent behind in achieving their 2022 RE targets.

Some BJP-ruled States like Uttar Pradesh and Madhya Pradesh achieved only 38 per cent and 46 per cent respectively of their targets. Gujarat achieved 97 per cent of its target while Tamil Nadu is next in the chart with 75 per cent achievement.

India had set a target of 175 GW this year. But as per the report, though there was increase in solar and wind installation capacity during the last six months across the country, it was not enough.

As of March 2022, India’s installed capacity RE capacity touched 110 GW (excluding large hydro), which is 63 per cent of the 175 GW target to be achieved by December 2022.
To go as box report

The striking aspect about Telangana’s achievement is the short duration in which it scaled up the RE capacity installation. As on March, 31, 2022, Telangana’s total installed capacity of RE is 4,919.19 MW as against total installed capacity of just 8 MW in 2014 when Statehood was achieved.

After State formation, the Telangana government focused on increasing the installed capacity of RE, and subsequently, about 200 MW of RE capacities were being set up every year, said a senior official from TSREDCO.

Telangana’s RE installed capacity as on March 31, 2022

– Small Hydro Power – 90.87 MW

– Wind Power – 128.10 MW
– Bio Power – 219.74 MW

– Solar Power – 4520.48 MW
– Total – 4919.19 MW

Link to comment
Share on other sites

One significant feature of Telangana 2014 is that the pace at which most projects are being completed. Public utility, infra, power, irrigation etc has seen really good progress and the pace at which they are being commissioned. 

Link to comment
Share on other sites

6 minutes ago, hyperbole said:

India’s largest floating solar plant commissioned last month in Ramagundam Telangana 

 

India’s largest floating power plant is in NTPC simhadri, AP. 

Link to comment
Share on other sites

3 minutes ago, Android_Halwa said:

One significant feature of Telangana 2014 is that the pace at which most projects are being completed. Public utility, infra, power, irrigation etc has seen really good progress and the pace at which they are being commissioned. 

Kaleshwaram will be a failed project. other than that which project completed 

Link to comment
Share on other sites

5 minutes ago, Android_Halwa said:

One significant feature of Telangana 2014 is that the pace at which most projects are being completed. Public utility, infra, power, irrigation etc has seen really good progress and the pace at which they are being commissioned. 

Warangal textile hub lo thumma chetlu molchai 

Link to comment
Share on other sites

19 minutes ago, JackSeal said:

Warangal textile hub lo thumma chetlu molchai 

Warangal textile hub emi karma, Kompally apparel park la anni units shut down..

Link to comment
Share on other sites

31 minutes ago, JackSeal said:

India’s largest floating power plant is in NTPC simhadri, AP. 

Simhadri di 25 mw idi 4 times bigger at 100mw, simhadri last year when it was inaugurated it was largest but this one surpassed it

However the world's largest solar power plant with 600 MW capacity is being set up on Omkareshwar Dam on Narmada river in Madhya Pradesh.

Link to comment
Share on other sites

30 minutes ago, JackSeal said:

Kaleshwaram will be a failed project. other than that which project completed 

City la radial roads and flyovers…almost 15 fly overs completed and another 8-10 about to be completed.

Power: Capacity addition in existing plants and Yadadri power plant to be commissioned this year. It takes decades to set up a Ultra Mega Power Project and TG Genco/BHEL is expected to complete in less than 4 years. Apart from this, Singareni, Bhadradri capacity addition completed and Singareni planning for another round of capacity addition.

Hyd-Srisailam Highway completed in less than an year. 200 km double lane pothole free.

Mission Bhageeratha…monumental sized project completed in less than 5 years. Typically takes decades.

Kaleshwaram on less than 5 years

Dindi lift in less than year, Kalwakurthy canal works less than an year, Hyd-Warangal highway expansion, Palamoor-Ranga Reddy lift almost 50-60% upto stage -3 to name a few..

 

  • Upvote 1
Link to comment
Share on other sites

5 minutes ago, Android_Halwa said:

City la radial roads and flyovers…almost 15 fly overs completed and another 8-10 about to be completed.

Power: Capacity addition in existing plants and Yadadri power plant to be commissioned this year. It takes decades to set up a Ultra Mega Power Project and TG Genco/BHEL is expected to complete in less than 4 years. Apart from this, Singareni, Bhadradri capacity addition completed and Singareni planning for another round of capacity addition.

Hyd-Srisailam Highway completed in less than an year. 200 oka double lane pot hole free.

Mission Bhageeratha…monumental sized project completed in less than 5 years. Typically takes decades.

Kaleshwaram on less than 5 years

Dindi lift in less than year, Kalwakurthy canal works less than an year, Hyd-Warangal highway expansion, Palamoor-Ranga Reddy lift almost 50-60% upto stage -3 to name a few..

 

Dharani, secretariat, yadadri, seeta rama lift irrigation(khammam), tuppakalugudem barrage(devadula - Warangal ) ,chenaka korata lift irrigation (adilabad), new districts and infrastructure like collectoraits etc. now every district will have a medical college plus hospital, every district will have a police HD and judiciary complexes 

Link to comment
Share on other sites

4 minutes ago, Android_Halwa said:

City la radial roads and flyovers…almost 15 fly overs completed and another 8-10 about to be completed.

Power: Capacity addition in existing plants and Yadadri power plant to be commissioned this year. It takes decades to set up a Ultra Mega Power Project and TG Genco/BHEL is expected to complete in less than 4 years. Apart from this, Singareni, Bhadradri capacity addition completed and Singareni planning for another round of capacity addition.

Hyd-Srisailam Highway completed in less than an year. 200 oka double lane pot hole free.

Mission Bhageeratha…monumental sized project completed in less than 5 years. Typically takes decades.

Kaleshwaram on less than 5 years

Dindi lift in less than year, Kalwakurthy canal works less than an year, Hyd-Warangal highway expansion, Palamoor-Ranga Reddy lift almost 50-60% upto stage -3 to name a few..

 

Lol mission baghiratha lo enni nallalaki water vasthunai… already every house has taps and every village has overhead tanks pre 2014, 95% of mission bhagiratha is of no use. Go to any telangana village and and ask them to show mission Bhagiratha tap. 95% of villages are still fed by borewells and overheads tanks. Ma mission bhagiratha nalla lo oka two days murki water echindru then katham.
 

Hyderabad Srisailam Highway lo telangana share entha ?

dewadula tho warangal, jangaon areas lo lakes nimpi kaleshwaram annadu 

Flyovers CBN time lo nundi unnai, natural growth kuda KCR account lo veyaku

 Hyderabad Warangal highway expansion lo state share entha ? it’s a central project

anni dora account lo veyaku 

 

Link to comment
Share on other sites

1 minute ago, JackSeal said:

Lol mission baghiratha lo enni nallalaki water vasthunai… already every house has taps and every village has overhead tanks pre 2014, 95% of mission bhagiratha is of no use. Go to any telangana village and and ask them to show mission Bhagiratha tap. 95% of villages are still fed by borewells and overheads tanks. Ma mission bhagiratha nalla lo oka two days murki water echindru then katham.

Hehe...mission bhageeradha ante inti ki nalla pettadam or over head tank kattadam kadu kaka...villages are interconnected by pipeline network. There are still many villages which still depend on underground or borewells, many mandals are 100% connected. I come from a rain parched district, summer la water vunte ekuva...maa intlo nalla vundi, ovr head tank vundi...it was connected to grid and water is now assured. 

Link to comment
Share on other sites

5 minutes ago, JackSeal said:

Lol mission baghiratha lo enni nallalaki water vasthunai… already every house has taps and every village has overhead tanks pre 2014, 95% of mission bhagiratha is of no use. Go to any telangana village and and ask them to show mission Bhagiratha tap. 95% of villages are still fed by borewells and overheads tanks. Ma mission bhagiratha nalla lo oka two days murki water echindru then katham.
 

Hyderabad Srisailam Highway lo telangana share entha ?

dewadula tho warangal, jangaon areas lo lakes nimpi kaleshwaram annadu 

Flyovers CBN time lo nundi unnai, natural growth kuda KCR account lo veyaku

 Hyderabad Warangal highway expansion lo state share entha ? it’s a central project

anni dora account lo veyaku 

 

Ohh..Ardam ayindi nee badha..!! KCR ki credit ivadame na..

Okasari sarigga chudu, nenu ekada kuda KCR/Dora/TRS ani prastavinchaledu. TG State ane seppina...

Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

×
×
  • Create New...