Hyderabad’s most complex flyover to date to be opened soon


hyperbole

Recommended Posts

The contour/topography of the land makes it such a complex flyover passing through the skyscrapers and narrow stretches, the literally dug up 15 meters or 40 feet to lay the foundations for pillars and one of the first precast steel flyover(pier, pier caps and Skelton owning to twists and turns), it is a multi level flyover which connects ORR exits, gachibowli junction to IKEA junction via backside of Deloitte towers

 

 

 

last year video 

 

  • Upvote 1
Link to comment
Share on other sites

17 minutes ago, hyperbole said:

The contour/topography of the land makes it such a complex flyover passing through the skyscrapers and narrow stretches, the literally dug up 15 meters or 40 feet to lay the foundations for pillars and one of the first precast steel flyover(pier, pier caps and Skelton owning to twists and turns)

 

 

 

last year video 

 

 

Test drive mana Kalvakuntla krishna milan rao tho cheyinchali

  • Haha 1
Link to comment
Share on other sites

Nakenduko Hyd choostey CBN ey gurtu vastadu first flyover kattindi CBN. Aa iT buildings choostey motham ayana chalave. But Amaravathi lo enduku minimum okka pedda company Ayina teleka poyado papam 

Link to comment
Share on other sites

12 minutes ago, MysoreJackson said:

Uppal flyover is taking forever to complete, it's important one for East side development. still pending...

it will finish soon

KTR binami projects vastunnai near LB Nagar chowrasta

Link to comment
Share on other sites

9 minutes ago, Aryaa said:

Nakenduko Hyd choostey CBN ey gurtu vastadu first flyover kattindi CBN. Aa iT buildings choostey motham ayana chalave. But Amaravathi lo enduku minimum okka pedda company Ayina teleka poyado papam 

@Telugodura456 and @futureofandhra ki e post chudagane happy tears agavu

  • Haha 2
Link to comment
Share on other sites

complex enduku? jaruguthunna accidents saripovatledhu anaa?

promo material aey theda kodthundi annayya.. they shouldn't call a flyover complex. some other adjective would be better.

Link to comment
Share on other sites

42 minutes ago, MysoreJackson said:

Uppal flyover is taking forever to complete, it's important one for East side development. still pending...

NHAI chestunnadi aa project, state government land acquisition chesi hand over chesindi, the contractor went bankrupt and kept on hold for the last 6 months and only got restarted 2 weeks ago.  It is a funny proposition, ghmc requested them to extend the flyover beyond uppal junction and NHAI denied it, hence GHMC started sections of the flyover from hubsiguda stadium which will cross uppal metro and the gets attached to what NHAI is building 

 

 

 

 

 

NHAI is a poor show, the newly opened flyover in shamshabad/gananpad has been closed for a engineering defect, they are repairing it after taking 5 years to build it.

Similarly amberpet 6 number daggara kuda NHAI, slow as molasses 

  • Upvote 1
Link to comment
Share on other sites

1 hour ago, Aryaa said:

Nakenduko Hyd choostey CBN ey gurtu vastadu first flyover kattindi CBN. Aa iT buildings choostey motham ayana chalave. But Amaravathi lo enduku minimum okka pedda company Ayina teleka poyado papam 

Chuste repu podunna Golconda  osmania university

Nizam college

City college Muslim Jung bridge anni cbn ee kattadu anale unnave

 

Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

×
×
  • Create New...